CRAH, FWU, MAU & FCU Chill water system and equipment Pipe connection c/w Pressure Testing & Flushing
CRAH, FWU, MAU & FCU Chill water system and equipment Pipe connection c/w Pressure Testing & Flushing
Cooling tower water system and equipment Pipe connection c/w Pressure Testing & Flushing.
Cooling tower water system and equipment Pipe connection c/w Pressure Testing & Flushing.
Underground NEWater system pipe connection, complete with pressure testing & flushing.
CRAH chill water system and equipment pipe connection, complete with pressure testing & flushing.
Package plantroom — installation of heat exchanger, MUAs, FCUs & tanks, complete with pipe works & brackets.
BAC cooling tower, 765 RT x 2 units, installed from CKD parts complete with chilled-water pipe installation.
New vacuum pump installation, complete with pipe tie-in connection.
Additional chilled-water pump & heat exchanger tie-in from existing header.
Replacement of cooling tower & pipe works.
Replacement of make-up water tanks & pipe works.
Replacement of make-up water tanks & pipes.