Home
About Us
Services
Air Conditioning & Ventilation System
Cooling Tower & Water Pump Systems
Piping Works
Mechanical Works
Projects
Careers
Contact Us
Building The Future, Restoring The Past
On-Site Chilled Water & Condenser Water Pipe Installation Works
Scope of Work
Supply, fabrication, and installation of chilled water and condenser water piping systems
Installation of carbon steel and stainless steel pipework, fittings, valves, and accessories
Fabrication and erection of pipe supports, hangers, and seismic bracing.
Site measurement, spool fabrication, alignment, welding, and pipe connection works.
Installation of butterfly valves, balancing valves, strainers, flexible connectors, and expansion joints.
Hydrostatic pressure testing, flushing, chemical cleaning, and commissioning support.
Connection of chillers, cooling towers, pumps, AHUs, FCUs, and heat exchangers.
Project Highlights
Chilled Water Supply & Return Piping
Condenser Water Supply & Return Piping
Valve Installation & Testing
Pipe Support & Hanger Installation
Site Fabrication & Welding
Pressure Testing, Flushing & Commissioning Support
Data Centre, Pharmaceutical & Commercial Building Projects